demolition day
and began
splitting their
time between
the basement
and their second
floor.
After drawing plans
and applying for
permits, Darrell set out to
revitalize the first floor, from new
custom cabinetry and a quartz coun-
tertop in the kitchen, as well as hand-
scraped engineered hardwood flooring
for a modern, rustic appearance, to a
new bathroom, laundry space, win-
dows and front door, updated staircase
and a former closet-turned recharging
station for electronic devices.
As the project progressed, Darrell kept
the renovation on pace. He applied
new polyurethane spray-foam insu-
lation to the outside walls, adapted
to changes in the electrical code and
managed several modifications to the
original plan. According to Brett,
“Way-Mar was really good with all
the changes we made along the way.
Their response was always, yes, we
can do that.” Brenda agrees, adding
that “working with Way-Mar has been
great. They know what they’re doing
and they know the decisions that need
to be made. With Way-Mar, we have
the confidence that things are done
right.”